The Remodel in Boulder
Site plan review was approved on 2/6/09 House permit 3/22/2010, CO 3/29/11 moved in 4/2/11 2016 May 10 - house continues to perform and live well
Tuesday, November 5, 2019
Monday, October 28, 2019
Tuesday, November 18, 2014
A few updates
added trim detail to the barn
to cover the door track hardware
Suspended table from Doug Fir slabs
and a bench as well
The slabs came from a fir tree blow down in the Sangres
Had to install a new solar hot water storage tank - holding water so far
Sunday, January 22, 2012
New pictures and such
A recent sunset.
SW exposure
East face
Kitchen duty
The solar side of the house
The barn
Less trees, more insolation in winter
Under the rim
Party spot
It got all rusty
SE corner
Sun time
Sunset - the standing wave
SW exposure
East face
Kitchen duty
The solar side of the house
The barn
Less trees, more insolation in winter
Under the rim
Party spot
It got all rusty
SE corner
Sun time
Sunset - the standing wave
Tuesday, April 19, 2011
A view of the house that became a home in early April 2011
the breezeway and stair case |
the fireplace surround in the den, made from scraps |
stairway to heaven |
the den |
the family room |
eating area, 2 story room |
kitchen |
mudroom built in box |
the bridge looking north |
the master fireplace |
the bed |
master bed into the bath view |
master fire |
the bridge, looking south |
the down stairs view into the den |
the master big window above the PV array |
the entry |
the master bath |
barn view to the west |
Thomas, somewhat terrified of the move |
Subscribe to:
Posts (Atom)